{"id":11995,"date":"2023-10-31T03:58:47","date_gmt":"2022-03-08T08:42:32","guid":{"rendered":"http:\/\/localhost\/xaydungnhadat\/?p=11995"},"modified":"2022-09-17T03:41:49","modified_gmt":"2022-09-17T03:41:49","slug":"factory-construction-unit-price","status":"publish","type":"post","link":"https:\/\/xaydungnhandat.com.vn\/?p=11995","title":{"rendered":"Factory Construction Unit Price"},"content":{"rendered":"\r\n<p><span style=\"font-weight: 400;\">The unit price for building a factory is one of the issues that investors are most concerned about when deciding to invest in a project and choose a construction unit for their project. <strong>Nhan Dat Construction Company<\/strong> would like to share the following article and try to describe in detail the elements affecting the construction unit price and unit price in order to the investors can refer to and give level total estimated investment costs for your construction.<\/span><\/p>\r\n<h2 class=\"wp-block-heading\"><strong>1. What does the factory construction cost include?<\/strong><\/h2>\r\n<p><span style=\"font-weight: 400;\">The factory construction unit price according to <strong>Nhan Dat Construction<\/strong> includes all the components for <strong>the construction of the factory:<\/strong><\/span><\/p>\r\n<ul>\r\n<li><span style=\"font-weight: 400;\">Factory construction supplies<\/span><\/li>\r\n<li><span style=\"font-weight: 400;\">Construction workers<\/span><\/li>\r\n<li><span style=\"font-weight: 400;\">Construction machinery of the project<\/span><\/li>\r\n<li><span style=\"font-weight: 400;\">Construction costs and methods.<\/span><\/li>\r\n<li><span style=\"font-weight: 400;\">Other costs: such as setting up temporary camps, electricity and water, management, security, etc.<\/span><\/li>\r\n<\/ul>\r\n<figure id=\"attachment_5534\" aria-describedby=\"caption-attachment-5534\" style=\"width: 1920px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-5534 size-full\" src=\"https:\/\/xaydungnhandat.com.vn\/wp-content\/uploads\/2020\/07\/don-gia-xay-dung-nha-xuong-tham-khao-1.jpg\" alt=\"Construction unit price for reference\" width=\"1920\" height=\"1280\" srcset=\"https:\/\/xaydungnhandat.com.vn\/wp-content\/uploads\/2020\/07\/don-gia-xay-dung-nha-xuong-tham-khao-1.jpg 1920w, https:\/\/xaydungnhandat.com.vn\/wp-content\/uploads\/2020\/07\/don-gia-xay-dung-nha-xuong-tham-khao-1-300x200.jpg 300w, https:\/\/xaydungnhandat.com.vn\/wp-content\/uploads\/2020\/07\/don-gia-xay-dung-nha-xuong-tham-khao-1-1024x683.jpg 1024w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><figcaption id=\"caption-attachment-5534\" class=\"wp-caption-text\">Application Factory construction price for reference<\/figcaption><\/figure>\r\n\r\n\r\n\r\n<p><span style=\"font-weight: 400;\">In this article, we give <strong>the factory construction<\/strong> unit price for the basic raw part including:<\/span><\/p>\r\n<ul>\r\n<li><span style=\"font-weight: 400;\">The foundation and factory floor.<\/span><\/li>\r\n<li><span style=\"font-weight: 400;\">The structural part of the steel frame and the wall is covered with corrugated iron.<\/span><\/li>\r\n<\/ul>\r\n<p><span style=\"font-weight: 400;\">Costs not included (these parts need detailed design drawings to see):<\/span><\/p>\r\n<ul>\r\n<li><span style=\"font-weight: 400;\">Electricity, water, air conditioning<\/span><\/li>\r\n<li><span style=\"font-weight: 400;\">Factory fire protection room,\u2026<\/span><\/li>\r\n<\/ul>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\"><strong>2. What the elements affect to unit price of the construction steel frame factory?<\/strong><\/h2>\r\n<p><b>a. Uses of the factory<\/b><\/p>\r\n\r\n\r\n\r\n<p><span style=\"font-weight: 400;\">The uses of the factory will do what determines to the plan, the structure and the materials of the construction factory suitable, such as foundation solutions, steel structure options, anti-hot materials, covering solutions, The auxiliary items accompany\u2026<\/span><\/p>\r\n<figure id=\"attachment_5536\" aria-describedby=\"caption-attachment-5536\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-5536\" src=\"https:\/\/xaydungnhandat.com.vn\/wp-content\/uploads\/2020\/07\/yeu-to-anh-huong-den-don-gia-thi-cong-nha-xuong-1.jpg\" alt=\"\" width=\"800\" height=\"686\" srcset=\"https:\/\/xaydungnhandat.com.vn\/wp-content\/uploads\/2020\/07\/yeu-to-anh-huong-den-don-gia-thi-cong-nha-xuong-1.jpg 700w, https:\/\/xaydungnhandat.com.vn\/wp-content\/uploads\/2020\/07\/yeu-to-anh-huong-den-don-gia-thi-cong-nha-xuong-1-300x257.jpg 300w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-5536\" class=\"wp-caption-text\">Electrical construction quotation list factory, package<\/figcaption><\/figure>\r\n\r\n\r\n\r\n<p><span style=\"font-weight: 400;\">The use of the factory is the first and prerequisite element that determines the cost of <strong>building a factory<\/strong>.<\/span><\/p>\r\n<ul>\r\n<li><span style=\"font-weight: 400;\">For example: A factory that only serves as a warehouse for light goods, the requirements are not high for the factory, but if it is a warehouse for machinery, mechanical or valuable products, the workshop floor requirements must be high, must ensure safety, may have to add a crane to serve the lifting and transportation.<\/span><\/li>\r\n<\/ul>\r\n<p><span style=\"font-weight: 400;\">If the factory&#8217;s function is to serve business and production, out of the factory, there must be other supporting works such as offices, canteens, motels for officials and employees, garages, warehouses for materials, product storage, etc.<\/span><\/p>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\">b. Factory construction site<\/h3>\r\n\r\n\r\n\r\n<ol>\r\n<li><b> Place for building the factory<\/b><\/li>\r\n<\/ol>\r\n<p><span style=\"font-weight: 400;\">The position and location of the factory also have a significant influence on the <strong>unit cost of construction<\/strong>, such as the following elements:<\/span><\/p>\r\n<ul>\r\n<li><span style=\"font-weight: 400;\">Is the geology of that area good?<\/span><\/li>\r\n<\/ul>\r\n\r\n\r\n\r\n<p><span style=\"font-weight: 400;\">If your <strong>factory construction<\/strong> position is situated on good and flat land, it will reduce a lot of cost for the foundation, but if the construction site is located on the soft flowing mud, the geology is uncertain, definitely will have to arise the solutions to reinforce the foundation, so the cost is slightly increased.<\/span><\/p>\r\n<ul>\r\n<li><span style=\"font-weight: 400;\">Is the place for building convenient?<\/span><\/li>\r\n<\/ul>\r\n<p><span style=\"font-weight: 400;\">To transport materials, supplies for construction work or not? Are the electricity and water lines to serve daily life and construction available or not? All affect the unit price of the construction for building projects. Because if it is not convenient, it will take a lot of effort to transport materials into construction.<\/span><\/p>\r\n\r\n\r\n<!-- wp:paragraph ---><!-- \/wp:paragraph -->\r\n\r\n<!-- wp:heading {\"level\":3} -->\r\n<h3><b>c. Factory construction scale<\/b><\/h3>\r\n<figure id=\"attachment_5537\" aria-describedby=\"caption-attachment-5537\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-5537 size-full\" src=\"https:\/\/xaydungnhandat.com.vn\/wp-content\/uploads\/2020\/07\/quy-mo-xay-dung-nha-xuong-1.jpg\" alt=\"quy-mo-xay-dung-nha-xuong-1\" width=\"800\" height=\"533\" srcset=\"https:\/\/xaydungnhandat.com.vn\/wp-content\/uploads\/2020\/07\/quy-mo-xay-dung-nha-xuong-1.jpg 800w, https:\/\/xaydungnhandat.com.vn\/wp-content\/uploads\/2020\/07\/quy-mo-xay-dung-nha-xuong-1-300x200.jpg 300w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-5537\" class=\"wp-caption-text\">The scale of factory construction<\/figcaption><\/figure>\r\n<!-- \/wp:heading -->\r\n\r\n<!-- wp:paragraph -->\r\n<p><span style=\"font-weight: 400;\">It is obvious that a large factory has a construction unit price \/m2 will be lower than a smaller factory.<\/span><\/p>\r\n<p><span style=\"font-weight: 400;\">With the same structural plan and material solution, the construction <a href=\"https:\/\/xaydungnhandat.com.vn\/bao-gia-xay-dung-thi-cong-nha-xuong\/\">unit price for the factory<\/a> <\/span><span style=\"font-weight: 400;\">but the scale of the factory 1000 m2, the factory 5000m2 and the factory 10,000 m2, the cost difference is not small.<\/span><\/p>\r\n<h3><b>d. Factory sample<\/b><\/h3>\r\n<p><span style=\"font-weight: 400;\"><strong>Factory construction<\/strong> costs for modern-style factories with new materials, the unit price will certainly have to a higher compared with the sample simple, traditional factory with cheaper materials.<\/span><\/p>\r\n<p><span style=\"font-weight: 400;\">Moreover, the attached accessories of the factory such as ventilation skylights, corrugated iron shutters, canopy roofs, or windows&#8230; also have an influence on <strong>the building cost of the factory<\/strong>.<\/span><\/p>\r\n<h3><b>e. Factory construction time<\/b><\/h3>\r\n<p><span style=\"font-weight: 400;\">The main material used in the construction of the factory here is steel (accounting for 70%), <\/span><span style=\"font-weight: 400;\">so <a style=\"font-size: 16px;\" href=\"https:\/\/xaydungnhandat.com.vn\/\"><strong>Nhan Dat Construction<\/strong><\/a> thinks that the unit price of the factory depends much on the unit price of steel. There are years that steel prices fluctuate up to 100% or 150%, so construction investment costs in that years may fluctuate 1.7 times. Not a small number at all for investors.<\/span><\/p>\r\n<p><span style=\"font-weight: 400;\">Moreover, the beginning of the year is the right time for construction because the weather is very favorable, construction projects are deployed rapidly. While at the end of the year many projects are running in progress while the rainy weather affects to the slow construction on the construction site.<\/span><\/p>\r\n<h3><b>f. Request for the factory construction progress<\/b><\/h3>\r\n<p><span style=\"font-weight: 400;\">The factory construction process takes place very quickly within 3-6 months, depending on the requirements of the investor.<\/span><\/p>\r\n<figure id=\"attachment_4755\" aria-describedby=\"caption-attachment-4755\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-4755 size-full\" src=\"https:\/\/xaydungnhandat.com.vn\/wp-content\/uploads\/2020\/07\/thoi-gian-thi-cong-nha-xuong.jpg\" alt=\"Construction progress of steel frame buildings\" width=\"800\" height=\"600\" srcset=\"https:\/\/xaydungnhandat.com.vn\/wp-content\/uploads\/2020\/07\/thoi-gian-thi-cong-nha-xuong.jpg 800w, https:\/\/xaydungnhandat.com.vn\/wp-content\/uploads\/2020\/07\/thoi-gian-thi-cong-nha-xuong-300x225.jpg 300w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-4755\" class=\"wp-caption-text\">Construction progress building steel frame buildings<\/figcaption><\/figure>\r\n<!-- \/wp:paragraph -->\r\n\r\n<!-- wp:paragraph -->\r\n<p><span style=\"font-weight: 400;\">Machines and equipment lines are calculated and purchased by the investor right after completing the construction to prepare for the production process. Sometimes for some reason, the construction progress of the factory is pushed up very quickly and requires a very high effort from the contractor, both in terms of human resources, machinery &#8230; and sometimes changes in construction organization methods on the construction site and this will make the high unit price of the construction.<\/span><\/p>\r\n<h3><strong>g. Factory construction contractor<\/strong><\/h3>\r\n<p><span style=\"font-weight: 400;\">In fact, there is not all unit prices that has the same among the contractors. Each contractor will have different capabilities and strengths, have different judgments and construction quality is different, so they will give different quotations. That is also normal if someone is knowledgeable about the factory market.<\/span><\/p>\r\n<!-- \/wp:paragraph -->\r\n\r\n<!-- wp:heading -->\r\n<h2 id=\"h2_3\">3. How to optimize factory construction costs?<\/h2>\r\n<!-- \/wp:heading -->\r\n\r\n<!-- wp:paragraph -->\r\n<p><span style=\"font-weight: 400;\">Do not be greedy for cheap quotes, but forget to care about quality. That is probably not the best solution for you. Price always goes with quality, so optimizing costs with a good quality to meet the requirements of the investor. It is always a complicated problem for both two partis.<\/span><\/p>\r\n<p><span style=\"font-weight: 400;\">To optimize costs, for both the investor and the contractor, we need to pay attention to the design stage and construction stage. Either of them is indispensable.<\/span><\/p>\r\n<figure id=\"attachment_4758\" aria-describedby=\"caption-attachment-4758\" style=\"width: 1366px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-4758 size-full\" src=\"https:\/\/xaydungnhandat.com.vn\/wp-content\/uploads\/2020\/07\/toi-uu-chi-phi-xay-dung-nha-xuong1.jpg\" alt=\"optimizing the cost of building steel frame factories\" width=\"1366\" height=\"655\" srcset=\"https:\/\/xaydungnhandat.com.vn\/wp-content\/uploads\/2020\/07\/toi-uu-chi-phi-xay-dung-nha-xuong1.jpg 1366w, https:\/\/xaydungnhandat.com.vn\/wp-content\/uploads\/2020\/07\/toi-uu-chi-phi-xay-dung-nha-xuong1-300x144.jpg 300w, https:\/\/xaydungnhandat.com.vn\/wp-content\/uploads\/2020\/07\/toi-uu-chi-phi-xay-dung-nha-xuong1-1024x491.jpg 1024w\" sizes=\"(max-width: 1366px) 100vw, 1366px\" \/><figcaption id=\"caption-attachment-4758\" class=\"wp-caption-text\">Optimizing the construction cost of steel frame factories<\/figcaption><\/figure>\r\n<!-- \/wp:paragraph -->\r\n\r\n<!-- wp:heading {\"level\":3} -->\r\n<p><b>Design period<\/b><\/p>\r\n<p><span style=\"font-weight: 400;\">To present a coherent architectural design plan, a reasonable and accurate structural plan to help the investor save costs and working time. A good design plan also allows the investor to avoid the costs of repair and renovation, which arise if any occur later.<\/span><\/p>\r\n<p><b>Factory construction period<\/b><\/p>\r\n<p><span style=\"font-weight: 400;\">You need to pay attention to <strong>construction methods and processes<\/strong>. If you have a good construction plan, it will save a lot of time and costs for both the investor and the construction contractor. This will demand a lot of effort and experience, the capacity of the contractor. Therefore, choosing a reputable construction contractor is also so essential.<\/span><\/p>\r\n<p><span style=\"font-weight: 400;\">With <strong>experienced and reputable factory construction companies<\/strong>, consulting on both design issues and construction methods is always a considered choice for investors. Because they will understand better to conduct construction more reasonably. And then, the contract signed will be the Design and Build contract\u2013 A company responsible for both design and construction. All will be in sync.<\/span><\/p>\r\n<!-- \/wp:paragraph -->\r\n\r\n<!-- wp:paragraph ---><!-- \/wp:paragraph -->\r\n\r\n<!-- wp:heading -->\r\n<h2>4. Unit price for construction of pre-engineered steel buildings in 2022<\/h2>\r\n<!-- \/wp:heading -->\r\n\r\n<!-- wp:paragraph -->\r\n<p><span style=\"font-weight: 400;\">As mentioned above, there are many elements that affect the construction unit price. So it is difficult to give an exact price, each contractor offers a different price.<\/span><\/p>\r\n<figure id=\"attachment_4759\" aria-describedby=\"caption-attachment-4759\" style=\"width: 960px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" class=\"wp-image-4759 size-full\" src=\"https:\/\/xaydungnhandat.com.vn\/wp-content\/uploads \/2020\/07\/don-gia-xay-dung-nha-xuong-frame-thep-tien-che.jpg\" alt=\"Construction unit price of pre-engineered steel frame factory\" width=\"960\" height=\"720 \" \/><figcaption id=\"caption-attachment-4759\" class=\"wp-caption-text\">Construction unit price of pre-engineered steel frame factory<\/figcaption><\/figure>\r\n<!-- \/wp:paragraph -->\r\n\r\n<!-- wp:paragraph -->\r\n<p><span style=\"font-weight: 400;\">As mentioned above, there are many elements that affect the construction unit price. So it is difficult to give an exact price, each contractor offers a different price.<\/span><\/p>\r\n<p><span style=\"font-weight: 400;\">For more detail about <strong>the factory construction unit price<\/strong>, you should contact directly to receive specific advice from professional companies in this field. (You can also contact <a href=\"https:\/\/xaydungnhandat.com.vn\/\"><strong>Nhat Dat Construction Company<\/strong><\/a>, we will offer free support and advice for you.)<\/span><\/p>\r\n<p><span style=\"font-weight: 400;\">Within the scope of the article, with a variety of construction experiences from small to large factory projects, we will give a basic and popular unit price for some types of factories, helps you have an overview and reference, estimate construction costs for your project.<\/span><\/p>\r\n<h3><b>Materials used to build pre-fabricated steel frames<\/b><\/h3>\r\n<table>\r\n<tbody>\r\n<tr>\r\n<td>\r\n<p>Job name<\/p>\r\n<\/td>\r\n<td>\r\n<p>Unit<\/p>\r\n<\/td>\r\n<td>\r\n<p>Note on supplies<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>D250 pile foundation &#8211; reinforced concrete<\/p>\r\n<\/td>\r\n<td>\r\n<p>m<\/p>\r\n<\/td>\r\n<td>\r\n<p>Vinakyoei Steel, ciphertext 6mm<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Pushing Melaleuca 4m in length, D8-10<\/p>\r\n<\/td>\r\n<td>\r\n<p>tree<\/p>\r\n<\/td>\r\n<td>\r\n<p>Melaleuca pile type 1 &#8211; straight, full condition<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Demolition of pile head concrete<\/p>\r\n<\/td>\r\n<td>\r\n<p>the<\/p>\r\n<\/td>\r\n<td>\r\n<p>Mechanical Machine<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Draw the ground manually<\/p>\r\n<\/td>\r\n<td>\r\n<p>m3<\/p>\r\n<\/td>\r\n<td>\r\n<p>Mechanical Machine<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Mechanized digging<\/p>\r\n<\/td>\r\n<td>\r\n<p>m3<\/p>\r\n<\/td>\r\n<td>\r\n<p>Mechanical Machine<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Draw the ground manually<\/p>\r\n<\/td>\r\n<td>\r\n<p>m3<\/p>\r\n<\/td>\r\n<td>\r\n<p>Mechanical Machine<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Mechanized soil filling<\/p>\r\n<\/td>\r\n<td>\r\n<p>m3<\/p>\r\n<\/td>\r\n<td>\r\n<p>Mechanical Machine<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Elevate the foundation with leveling sand<\/p>\r\n<\/td>\r\n<td>\r\n<p>m3<\/p>\r\n<\/td>\r\n<td>\r\n<p>Mechanical Machine<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Raise the foundation with a 0-4 degree<\/p>\r\n<\/td>\r\n<td>\r\n<p>m3<\/p>\r\n<\/td>\r\n<td>\r\n<p>Mechanical Machine<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Sanding of excess soil<\/p>\r\n<\/td>\r\n<td>\r\n<p>m3<\/p>\r\n<\/td>\r\n<td>\r\n<p>Mechanical Machine<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Stone-lined concrete 1&#215;2, M150<\/p>\r\n<\/td>\r\n<td>\r\n<p>m3<\/p>\r\n<\/td>\r\n<td>\r\n<p>XM Ha Tien, Holcim<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Stone concrete 1&#215;2, grade 250<\/p>\r\n<\/td>\r\n<td>\r\n<p>m3<\/p>\r\n<\/td>\r\n<td>\r\n<p>XM Ha Tien, Holcim<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Normal structural formwork<\/p>\r\n<\/td>\r\n<td>\r\n<p>m2<\/p>\r\n<\/td>\r\n<td>\r\n<p>Mechanical Machine<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Complex structural formwork (silos, arches)<\/p>\r\n<\/td>\r\n<td>\r\n<p>m2<\/p>\r\n<\/td>\r\n<td>\r\n<p>Mechanical Machine<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Processing and installing construction reinforcement<\/p>\r\n<\/td>\r\n<td>\r\n<p>kg<\/p>\r\n<\/td>\r\n<td>\r\n<p>Vinakyoei or Pomina Steel<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Build a wall of 10 bricks and pipes 8x8x18<\/p>\r\n<\/td>\r\n<td>\r\n<p>m3<\/p>\r\n<\/td>\r\n<td>\r\n<p>Den, SG, BD tunnel bricks<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Build a wall of 20 bricks and pipes 8x8x18<\/p>\r\n<\/td>\r\n<td>\r\n<p>m3<\/p>\r\n<\/td>\r\n<td>\r\n<p>Den, SG, BD tunnel bricks<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Build a wall of 10 bricks with 4x8x18 cards<\/p>\r\n<\/td>\r\n<td>\r\n<p>m3<\/p>\r\n<\/td>\r\n<td>\r\n<p>Den, SG, BD tunnel bricks<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Build a wall of 20 bricks with 4x8x18 cards<\/p>\r\n<\/td>\r\n<td>\r\n<p>m3<\/p>\r\n<\/td>\r\n<td>\r\n<p>Brick Tiles in Southeast, SG, BD<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Paint outside, M75<\/p>\r\n<\/td>\r\n<td>\r\n<p>m2<\/p>\r\n<\/td>\r\n<td>\r\n<p>XM Ha Tien, Holcim<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Tinside wall, M75<\/p>\r\n<\/td>\r\n<td>\r\n<p>m2<\/p>\r\n<\/td>\r\n<td>\r\n<p>XM Ha Tien, Holcim<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Put water-based paint on the wall<\/p>\r\n<\/td>\r\n<td>\r\n<p>m2<\/p>\r\n<\/td>\r\n<td>\r\n<p>Nippon wall putty<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Put water-based paint on columns, beams and ceilings<\/p>\r\n<\/td>\r\n<td>\r\n<p>m2<\/p>\r\n<\/td>\r\n<td>\r\n<p>Nippon wall putty<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Water paint on the outside wall<\/p>\r\n<\/td>\r\n<td>\r\n<p>m2<\/p>\r\n<\/td>\r\n<td>\r\n<p>Nippon paint + lining<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Painting beams, ceilings, walls in the house<\/p>\r\n<\/td>\r\n<td>\r\n<p>m2<\/p>\r\n<\/td>\r\n<td>\r\n<p>Nippon paint + lining<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Waterproofing according to technological process<\/p>\r\n<\/td>\r\n<td>\r\n<p>m2<\/p>\r\n<\/td>\r\n<td>\r\n<p>According to Sika technology<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Drywall partition &#8211; 1 side<\/p>\r\n<\/td>\r\n<td>\r\n<p>m2<\/p>\r\n<\/td>\r\n<td>\r\n<p>12mm plate, Vinh Tuong frame.<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Double-sided plasterboard partition<\/p>\r\n<\/td>\r\n<td>\r\n<p>m2<\/p>\r\n<\/td>\r\n<td>\r\n<p>12mm plate, Vinh Tuong frame.<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Frame (column + frame + beam + skylight + louver)<\/p>\r\n<\/td>\r\n<td>\r\n<p>kg<\/p>\r\n<\/td>\r\n<td>\r\n<p>CT3 Steel, TCXDVN<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Beams (roof + columns + purlins)<\/p>\r\n<\/td>\r\n<td>\r\n<p>kg<\/p>\r\n<\/td>\r\n<td>\r\n<p>CT3 Steel, TCXDVN<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>C purlin (black steel + paint)<\/p>\r\n<\/td>\r\n<td>\r\n<p>kg<\/p>\r\n<\/td>\r\n<td>\r\n<p>CT3 Steel, TCXDVN<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Flower Tole (4mm) Floor Cover<\/p>\r\n<\/td>\r\n<td>\r\n<p>m2<\/p>\r\n<\/td>\r\n<td>\r\n<p>CT3 Steel, TCXDVN<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Cemboard flooring 20mm (100kG\/m2)<\/p>\r\n<\/td>\r\n<td>\r\n<p>m2<\/p>\r\n<\/td>\r\n<td>\r\n<p>Thong Hung, Vietnam<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p>Tile roof<\/p>\r\n<\/td>\r\n<td>\r\n<p>m2<\/p>\r\n<\/td>\r\n<td>\r\n<p>Tole Hoasen, Povina<\/p>\r\n<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<!-- \/wp:paragraph -->\r\n\r\n<!-- wp:paragraph -->\r\n<h3><strong>1. <b>The unit price applies to pre-fabricated steel factory: over-span system from 20m to 30m<\/b><\/strong><\/h3>\r\n<p><span style=\"font-weight: 400;\">The price is from <strong>1,610,000 VND\/m2 \u2013 2,500,000 VND\/m2<\/strong> depending on the area, the scale of the factory, the industry activity, the column truss frame, the factory floor. The company offers a relatively accurate reference price quotation, depending on the area.<\/span><\/p>\r\n<p><strong>Preliminary description:<\/strong><\/p>\r\n<ul>\r\n<li><span style=\"font-weight: 400;\">Steel reinforced concrete factory floor, epoxy paint<\/span><\/li>\r\n<li><span style=\"font-weight: 400;\">Height below 7.5m;<\/span><\/li>\r\n<li><span style=\"font-weight: 400;\">Combined steel columns and trusses.<\/span><\/li>\r\n<li><span style=\"font-weight: 400;\">50mm thick roof panel, wall panel, aluminum glass door<\/span><\/li>\r\n<li><span style=\"font-weight: 400;\">Plaster ceiling<\/span><\/li>\r\n<\/ul>\r\n<p><strong>The factory uses reinforced concrete columns, pre-fabricated steel trusses frames, steel roofing.<\/strong><\/p>\r\n<p><span style=\"font-weight: 400;\">Construction unit price: 2,000,000 VND\/m2 to 2,200,000 VND\/m2.<\/span><\/p>\r\n<p><strong>Preliminary description:<\/strong><\/p>\r\n<ul>\r\n<li><span style=\"font-weight: 400;\">Height below 7.5m,<\/span><\/li>\r\n<li><span style=\"font-weight: 400;\">Reinforced concrete columns,<\/span><\/li>\r\n<li><span style=\"font-weight: 400;\">Combined steel truss, has skylight,<\/span><\/li>\r\n<li><span style=\"font-weight: 400;\">Steel roofing 0.45m<\/span><\/li>\r\n<li><span style=\"font-weight: 400;\">Wall 220 built 4m high, wall panel and shutter door<\/span><\/li>\r\n<\/ul>\r\n<h3>2\/ Unit price applies to simple factories and warehouses<\/h3>\r\n<p><b>2\/ The unit price applies to simple factories and warehouses<\/b><\/p>\r\n<p><span style=\"font-weight: 400;\">Area: under 1500m2, height below 7.5m, columns built with steel core or concrete columns, steel truss, iron box, wall construction 100mm, tole wall, tole roof<\/span><\/p>\r\n<p><span style=\"font-weight: 400;\">Without crane: Construction unit price is from <strong>1,300,000 VND\/m2 to 1,500,000 VND\/m2.<\/strong><\/span><\/p>\r\n<p><span style=\"font-weight: 400;\">With crane 5 &#8211; 10 tons: Construction unit price: <strong>1,800,000 VND\/m2 &#8211; 2,000,000 VND\/m2<\/strong><\/span><\/p>\r\n<p><strong>Brief description of the project:<\/strong><\/p>\r\n<ul>\r\n<li><span style=\"font-weight: 400;\">Height below 7.5m,<\/span><\/li>\r\n<li><span style=\"font-weight: 400;\">Wall 110 built 2m high, wall panel and shutter door<\/span><\/li>\r\n<li><span style=\"font-weight: 400;\">Steel roofing single layer 0.45m\u00a0<\/span><\/li>\r\n<li><span style=\"font-weight: 400;\">Combined steel truss column<\/span><\/li>\r\n<li><span style=\"font-weight: 400;\">Concrete base thick 15cm\u00a0<\/span><\/li>\r\n<\/ul>\r\n<h3><b>3\/ The unit price applies to prefabricated houses, factories, and warehouses (Not pouring concrete)<\/b><\/h3>\r\n<p><span style=\"font-weight: 400;\">\u00a0Price from: <strong>450,000 VND\/m2 \u2013 1200,000\/m2<\/strong>, purlin C thickness 1.8mm \u2013 2mm, Iron box 5\u00d710, 6\u00d712, Column I100 \u2013 I200 or use electric columns to reduce cost and increase the durability of products. Solid steel makes trusses, gusset plates, Bolts, Connecting screws, Tension cable, tole roof thick 4.5zem.<\/span><\/p>\r\n<p><span style=\"font-weight: 400;\">Note: The unit price of Nhan Dat given above is only for reference, if you want to find out the unit price of factory construction, please contact <strong>the reputable construction company Nhan Dat Construction<\/strong> to receive the most quotation exactly.<\/span><\/p>\r\n<h2>Frequently Asked Questions<\/h2>\r\n<p><b>Question 1: How much construction time will the pre-fabricated steel frame save?<\/b><\/p>\r\n<p><span style=\"font-weight: 400;\">The works pour traditional concrete will take 3-4 weeks to wait for the concrete to dry and moisturize the concrete, but with pre-fabricated steel frames combined with ultra-light panel floors, you can skip the curing time of the concrete. The construction time will be shortened by about 1 month. Not to mention if watering is not technically correct, homeowners will cause the concrete to crack.<\/span><\/p>\r\n<p><b>Question 2:\u00a0 Do the pre-fabricated steel frames save construction costs?<\/b><\/p>\r\n<p><span style=\"font-weight: 400;\">Saving construction time means that homeowners have saved a lot of arisen costs. When the construction time is prolonged, the electricity bill, worker&#8217;s fee, daily food bill, water bill, etc., many other additional fees also increase.<\/span><\/p>\r\n<p><b>Question 3: What type of floor is usually come with the pre-fabricated steel frame?<\/b><\/p>\r\n<p><span style=\"font-weight: 400;\">Comes with pre-fabricated steel frame is super light concrete floor, Deck floor, Cemboard Duarflex pre-assembled concrete floor. But the type that combines light panel floors with pre-fabricated steel frames is being used commonly today. Because the durability of lightweight concrete floors is equivalent to reinforced concrete, it creates more peace of mind for customers than other types of floors.<\/span><\/p>\r\n<p><b>Question 4: How are the projects suitable for pre-fabricated steel frames?<\/b><\/p>\r\n<p><span style=\"font-weight: 400;\">Just installing the pre-fabricated steel bars that are designed according to the design drawing, so using pre-fabricated steel frames will be suitable for projects that need to shorten construction time, have a small location, in alleys, no waiting position for gathering construction materials, not intending to continue expanding, repairing anymore, basement garage, supermarket, building factories,&#8230;<\/span><\/p>\r\n<p><span style=\"font-weight: 400;\">Currently, construction is should use pre-fabricated steel frames rather than traditional methods.<\/span><\/p>\r\n<p><b>Question 5: Can pre-engineered steel frames be applied to new house construction?<\/b><\/p>\r\n<p><span style=\"font-weight: 400;\">For newly built houses that already have a strong and solid foundation, they apply the pre-fabricated steel frames, which is considered the smartest decision. Because there is a solid fulcrum, building a house with a pre-fabricated steel frame will become faster and simpler. Just transporting the pre-fabricated steel frames designed to the construction site and executing assembly according to the design drawings is fine.<\/span><\/p>\r\n<p>READ MORE:<\/p>\r\n<p><iframe loading=\"lazy\" title=\"C\u00f4ng Ty X\u00e2y D\u1ef1ng Nh\u00e2n \u0110\u1ea1t - L\u1ec5 kh\u1edfi c\u00f4ng nh\u00e0 x\u01b0\u1edfng LUCKYSTAR\" width=\"1020\" height=\"574\" src=\"https:\/\/www.youtube.com\/embed\/mtAFPs1OPTg?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\r\n<!-- \/wp:paragraph -->","protected":false},"excerpt":{"rendered":"<p>The unit price for building a factory is one of the issues that investors are most concerned about when deciding to invest in a project and choose a construction unit for their project. Nhan Dat Construction Company would like to share the following article and try to describe in detail the elements affecting the construction [&#8230;]\n","protected":false},"author":2,"featured_media":4755,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[88],"tags":[],"_links":{"self":[{"href":"https:\/\/xaydungnhandat.com.vn\/index.php?rest_route=\/wp\/v2\/posts\/11995"}],"collection":[{"href":"https:\/\/xaydungnhandat.com.vn\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/xaydungnhandat.com.vn\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/xaydungnhandat.com.vn\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/xaydungnhandat.com.vn\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11995"}],"version-history":[{"count":2,"href":"https:\/\/xaydungnhandat.com.vn\/index.php?rest_route=\/wp\/v2\/posts\/11995\/revisions"}],"predecessor-version":[{"id":12202,"href":"https:\/\/xaydungnhandat.com.vn\/index.php?rest_route=\/wp\/v2\/posts\/11995\/revisions\/12202"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/xaydungnhandat.com.vn\/index.php?rest_route=\/wp\/v2\/media\/4755"}],"wp:attachment":[{"href":"https:\/\/xaydungnhandat.com.vn\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11995"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/xaydungnhandat.com.vn\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11995"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/xaydungnhandat.com.vn\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11995"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}